SMA · Sunny Boy Inverters
The inverter is waiting for the conditions to be met to start feeding power into the grid. It is not currently active.
Click steps to track your progress.
Ensure the AC circuit breaker is switched on.
Turn the DC load-break switch of the inverter to the 'I' (on) position.
Wait for the inverter to complete its start-up phase (approximately 90 seconds). The green LED should then start flashing or glowing if conditions are met.
If the green LED continues flashing, the grid conditions for operation are still not met.