CodeRegistry
Brands
  1. Home
  2. SMA
  3. Sunny Boy Inverters
  4. Riso-Sense
About·Privacy·Terms

CodeRegistry — Your global library for technical solutions.

For your safety: always follow the equipment manufacturer’s official manuals. CodeRegistry is an independent help site and is not affiliated with the brands listed here.

Riso-Sense

Riso-Sense — Insulation measurement failed

SMA · Sunny Boy Inverters

What does Riso-Sense mean?

The inverter's internal insulation measurement process has failed to complete successfully. This may indicate an issue with the measurement system itself or an underlying insulation problem in the PV array.

Common Causes

  • Insulation measurement failed.

Repair Steps & Checklist

Click steps to track your progress.

  1. 1

    If this problem recurs, contact your installer for a diagnostic check.

  2. 2

    If the issue persists, contact the SMA Serviceline for further assistance.

  3. 3

    Ensure all connections are secure and there is no visible damage to the PV system wiring or inverter.

Browse all codes in this manual (70)
Verified technical data. Last updated: April 2026

Related Faults

!PV-Overvoltage!!PV-Overvoltage! !DISCONNECT DC! — Overvoltage at DC input10251Event 10251 — Communication status to network switch or DHCP server changed10252Event 10252 — Communication disrupted
Source: SMA Sunny Boy Inverters
Open Manual (Page 32)Search more codes in this manual