CodeRegistry
Brands
  1. Home
  2. Fujitsu
  3. Waterstage SuperHP Heat Pumps
  4. 100
About·Privacy·Terms

CodeRegistry — Your global library for technical solutions.

For your safety: always follow the equipment manufacturer’s official manuals. CodeRegistry is an independent help site and is not affiliated with the brands listed here.

100

Error 100 - Two master clocks on bus

Fujitsu · Waterstage SuperHP Heat Pumps

What does 100 mean?

The user interface displays '100: 2 master clocks on bus', indicating that there are two devices configured as master clocks on the same communication bus, causing a conflict. This error typically triggers an automatic reset.

Common Causes

  • Incorrect configuration of multiple devices as master clocks.
  • Installation error during system setup.
  • Device malfunction causing it to incorrectly claim master status.

Repair Steps & Checklist

Click steps to track your progress.

  1. 1

    Turn off the main power supply to the heat pump for 30 seconds, then turn it back on.

  2. 2

    Access system settings (if possible) to identify and reconfigure the clock settings for connected devices.

  3. 3

    Allow time for the automatic reset to occur (default 6 hours) or use the manual reset function (Line 6711) if available.

  4. 4

    Contact a qualified service technician to resolve the master clock conflict.

Browse all codes in this manual (60)
Verified technical data. Last updated: April 2026

Related Faults

10Error 10 - Outdoor sensor fault102Error 102 - Clock without running supply105Error 105 - Maintenance message
Source: Fujitsu Waterstage SuperHP Heat Pumps
Open Manual (Page 93)Search more codes in this manual